EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
cbecker
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (163)
Avionics
- (1)
-
PTT Button
Controls
- (4)
-
Rear control stick...
-
Fabricated throttle...
-
Throttle mockup
-
Rudder pedal
Empennage
- (1)
-
Vertical Fin
Engine
Firewall
Fuel System
Fuselage
- (83)
-
Fabricated step
-
Brake pedal...
-
Upper baggage...
-
Upper Baggage Shelf
-
Rear shoulder...
-
Finish welded front...
-
Fabricated fairlead...
-
Rear fuselage tabs...
-
Nut plates
-
Floorboard tabs for...
-
Shoulder harness...
-
Shoulder harness...
-
Cut and fit...
-
Seat belt bushings
-
Extended baggage...
-
Installed floorboard...
-
Extended baggage...
-
Shoulder harness...
-
Front Seat Belt
-
Fabricated and tack...
-
Removable Cross...
-
Brake pedal support...
-
Upper Baggage Door...
-
Lower baggage door
-
Lower Baggage Door
-
Rear Rudder Pedals
-
Rudder Pedal Brackets
-
Turtle deck and Rear...
-
Turtle Deck Install
-
Fabricated More...
-
Turtle deck attachments
-
Welding Clean Up
-
Seat belt attachment
-
Left Upper Door
-
Hinges for upper door
-
Hinges for upper door
-
Upper Door Frame...
-
Upper Door Frame...
-
Upper Door Frame
-
Upper Door Frame
-
Starting on Upper Doors
-
Upper Door Frame...
-
Door frame
-
Stirrup
-
Reinforced rear...
-
Attached Rudder
-
Welding Rudder Tabs
-
Extended Baggage
-
Tail Wires
-
Tail wire attachment
-
Pulley Alignment
-
Trying on the...
-
Lower Door Construction
-
Forward Cockpit Tubing
-
Fuselage Tubing in...
-
Forward Tubing
-
Fixturing up the...
-
Trimming the Longerons
-
Cathedral Baggage
-
Auto Entry: Oct 26,2013
-
Piper Channel
-
Auto Entry: Oct 19,2011
-
Fuselage Tailpost
-
Fuselage Firewall
-
Top of Fuselage
-
Fuselage Frame Up
-
Fuselage Completely...
-
Fuselage Overview
-
Tail post
-
Auto Entry: Jul 10,2011
-
Fuselage
-
Reverse Dogleg
-
Rosette Weld
-
Fuselage Sides
-
Fuselage Side Tacked
-
Fuselage Side...
-
Fuselage Fabrication
-
Bending Longerons...
-
Fuselage Fabrication
-
Bending Longerons
-
Layout
-
Fuselage Layout
-
Laying Out Fuselage...
Inspection
Instrument Panel
Interior Finish
Landing Gear
- (4)
-
Welded gear leg step
-
Landing Gear...
-
Added Step
-
Axles
Lighting
Paint / Decals
Propeller
Research
- (4)
-
Panel-Carbon Cub
-
Panel-Minimalist
-
Panel-Legend Cub...
-
Is this entry really...
Tail Feathers
- (9)
-
Horn for trim tab
-
Finished welding...
-
Trim Tab
-
Trim tab
-
Trim Tab
-
Tail Feathers Installed
-
Tail Feathers
-
Auto Entry: Feb 29,2012
-
Elevator
Tools
- (7)
-
New TIG welding cup
-
Metal cutting bandsaw
-
Rear seat back
-
1 inch Belt Sander
-
Tools Used for...
-
Bench Grinder
-
Tube Forming
Wings
- (34)
-
Floating nutplates
-
Auto Entry: Apr 10,2021
-
Auto Entry: Apr 3,2021
-
Auto Entry: Apr 3,2021
-
Auto Entry: Mar 16,2021
-
Auto Entry: Mar 7,2021
-
Auto Entry: Mar 3,2021
-
Auto Entry: Feb 28,2021
-
Auto Entry: Feb 28,2021
-
Right Flap
-
Right flap
-
Right aileron
-
Deburr Right Aileron
-
Right aileron
-
Left Aileron
-
Aileron riveting
-
Riveting Flap
-
Flap construction
-
Right Flap
-
Left Aileron
-
Aileron and flap...
-
Aileron Tail Ribs
-
Riveting Ailerons
-
First Squeezed Rivets
-
Riveted Control Horn...
-
Unpacked Kit
-
Trip to Javron to...
-
Load Test of Rib to...
-
Load Test of Rib
-
Load Test of Rib
-
Prototype Rib #1
Flaps
- (2)
-
Flap spar
-
Auto Entry: Aug 6,2020
Workshop
Auto Entry
- (14)
-
Auto Entry: May 18,2021
-
Auto Entry: Apr 25,2021
-
Auto Entry: Aug 7,2020
-
Auto Entry: Aug 7,2020
-
Auto Entry: Dec 8,2013
-
Auto Entry: Nov 26,2013
-
Auto Entry: Mar 4,2012
-
Auto Entry: Mar 4,2012
-
Bending Piper Channel
-
Auto Entry: Jan 30,2012
-
Auto Entry: Sep 2,2011
-
Auto Entry: Aug 26,2011
-
Auto Entry: Aug 7,2011
-
Auto Entry: Jul 23,2011
Builder Name:
Charlie Becker
-
Project:
Pirate Cub
-
VIEW REPORTS
Total Hours:
103.5
Start/Last Date:
Jan 30, 2011 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=cbecker
Home or Last Project Picture
Jun 03, 2020
Cut and fit floorboard for extended baggage compartment
- (2 hours)
Category: Fuselage
Cut and fit plywood into the extended baggage compartment based on cardboard template. Used 1/4"" Baltic Birch plywood from Menards. The cuts were not one straight line as the fuselage curves back to the tail. We were able to use the straight edge but each side had to be divided into three straight cuts. Used a jigsaw and taped both sides of the plywood to limit breakout.
0EC7DE61-BD99-4C0C-ADE6-582833A56501.jpeg
75122C96-A64B-465D-BBE3-CE24AC85C06D.jpeg
850A2FD2-6C29-4FF1-8C9A-071ABF300D4B.jpeg
876EECB7-F0EF-4047-A013-B3117BCA6ACA.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.